Back

Vulkan® Conical Connection


Immediate loading and part making on interfaces

Dr. Fernando Germán

Abstract

Implantation process: Two fractured teeth are replaced by two immediate Vulkan Conical Connection implants. After an osseointegration period of 3 to 4 months with healing caps with emergence profile, the zirconium parts are placed on two non-hexagonal interfaces.
¿Necesita ayuda?
error: Content is protected !!